News image

Renovation

Bettendorf Christian Church

To accommodate a growing congregation, Bettendorf Christian Church underwent a 16,000 SF addition and 10,000 SF renovation project. Their goals were to increase space, improve traffic flow and enhance their children’s and student ministries. The church determined a multi-use worship area that seats up to 850 with a gym layout would offer the greatest flexibility to convert the space for a variety of activities and events.

The Church’s gym/worship area includes a stage, a separate audio-visual area, and a baptistry. The welcoming front entrance provides an open space for members to congregate, the kitchen an opportunity to serve, and the cafe a way to enjoy coffee and conversation before or after services.

 

St. Ambrose University | McMullen Hall

McMullen Hall is nestled on the southwest corner of the St. Ambrose University campus and is the new, state-of-the-art home to the University’s College of Business. The $8.6 million project included the renovation of the existing 38,000 SQFT building and a 16,000 SQFT addition. According to St. Ambrose, “a major focus of the project has been the integration of old and new, reflecting the University’s agility while holding tight to our history and mission.”

The new addition features ten new classrooms and a student commons area highlighted, a sales lab with six individual team rooms, a tiered lecture classroom, and a finance lab. The varied classroom styles assist the University in preparing students for the business world, which focuses on teams and collaboration. The renovation of the existing building converted existing classrooms into faculty offices and added a Dean’s office suite.

McMullen Hall features a variety of learning classrooms

The updates to SAU's McMullen Hall blended the old with new

Lecture-style classrooms were a part of the newly renovated McMullen Hall

0 This is an exterior shot of the newly renovated McMullen Hall on the St. Ambrose University campus

St. Ambrose University recently renovated McMullen Hall

United Township High School | Student Life Center

The Student Life Addition at United Township High School consists of a 25,624 SF addition and 6,687 SF renovation of the administrative offices, Media Collections Center, Student Store
and Café. It also features a Student Life Area which provides a gathering space for students that serves as a central location for students to gather, socialize, and interact with each other. The Student Life Area is connected to the existing cafeteria that consists of 19,059 SF and underwent a cosmetic renovation as part of this project.

The American Institute of Architects (AIA) Iowa named the United Township High School project a 2020 People’s Choice Award WinnersOPN Architects led the design of this exceptional project that we are pleased to be the construction manager of.

Students fill the library at United Township High School

This is an exterior image of the brand new United Township High School additional and school renovation

United Township High School Cafeteria

Rock Island Arsenal | Building 250

Building 250 on the Rock Island Arsenal was a vacant, deteriorating building that required extensive renovation in order to make it ready for industrial use. Bush Construction was able to work with the Rock Island Arsenal Development Group (RIADG), a group that represents a public/private partnership, whose mission is to provide civilian businesses a cost-effective option while restoring existing, un-utilized government buildings.

The renovation of this historic facility began by coordinating with the owner’s abatement contractor to develop a phased start to the project as the abatement and remediation efforts were carried out. Historic preservation guidelines needed to be in followed during the major building envelope modifications. New office spaces, a break room, restrooms, and a locker room were also added.

Bush also faced a myriad of changes to the original scope of work, over the course of this project, including the discovery of deteriorating pyro-bar roof panels, which necessitated their replacement, and the replacement of a large area of woodblock floor with a hardened, reinforced concrete topping. Bush Construction accommodated these significant changes to the project with schedule modifications and were able to overcome these conditions, turning the vision of the RIADG into reality.

Vander Veer Park | Enabling Garden

Vander Veer Park Enabling Garden is a 3,000 SF project that created an accessible garden for people of all ages and physical abilities. This garden featured raised flower beds and serpentine shaped concrete planters with sandblasted finishing, accessible paths, a pergola, water feature, custom-made western red cedar fence, teak wood cabinets and doors, wrought iron gates and various flowers & plants that appeal to all of the senses.

This unique project allowed Bush Construction to work with the City of Davenport, a client we have worked closely with in the past. The Garden required a high level of communication at all times amongst Bush Construction, the City of Davenport, the design team, and all of the subcontractors and suppliers performing work on the project.

Bush Construction takes pride in our involvement with the Enabling Garden, as it was designed to improve and maintain the physical, mental, and social health of those who utilize it. Our strong ties and involvement in our community make projects such as the Enabling Garden extremely gratifying.

Black Hawk College

The 16,000 SF Black Hawk College project created a welcoming entrance for all students, especially new and prospective students. The goal of this project was to create a new “front door” for the Black Hawk QC Campus.

Bush Construction was able to construct precisely what the college wanted while completing the project 4 months ahead of schedule. The addition of several owner-requested change orders were executed to ensure the client’s complete satisfaction with all aspects of the project.

We were able to coordinate these changes, while never losing sight of our schedule. This early completion allowed the owner to begin operations well before the anticipated timeframe.

Demolition and construction activities commenced while the semester was in session. To accommodate the students, flooring in existing corridors needed to be completed over weekends and holidays. It is our goal, at Bush Construction, to work closely with the client to meet their needs, especially when that involves working in an occupied space.

St. Ambrose University | Ambrose Hall Exterior

Bush Construction rose to the challenge on this project to completely restore the exterior facade of St. Ambrose Hall, the fully-occupied campus icon of St. Ambrose University built in 1885. This renovation served two purposes: to repair the deteriorating facade of the building and to return the structure to its original configuration based on construction plans that were developed 128 years ago. This complex project required daily coordination and cooperation from both the project team and the university faculty. Countless hours were spent in pre-planning the coordination, delivery, removal, and replacement of each of the 370 custom window units.

Other major construction activities included the replacement of all deteriorated brick and stone, tuckpointing of all masonry joints, restoration of all wood soffit, fascia and cornice work, replacement of the majority of the existing roof material, restoration of the existing clock tower, restoration of the existing dormers, and removal and infill of the existing exterior fire escapes. Mansards were restored to their original condition with the use of natural slate and copper flashings.

Bush Construction also built North Hall, a new residence hall, for St. Ambrose University in 2012.

Western Illinois University Riverfront Campus | Phase I

This LEED Silver project at Western Illinois University’s Riverfront Campus consisted of the partial demolition of the existing structure, a large 2-story addition, and the complete remodeling of the entire existing structure. The facility houses classrooms, computer labs, conference rooms, meeting rooms, Engineering Technology labs, and offices. The mechanical and electrical systems are highly integrated and efficient utilizing advanced automation and geothermal technology. Many other sustainable features were incorporated into the project like a green roof, cork flooring, and bamboo wall treatments.

Have an inquiry?